Scope of works: Installation of all new subcritical/transcritical CO2 system, fully integrated into the building cold storage, freezer system, HVAC, and hot water generation.
- Installation of two Bitzer transcritical CO2 racks.
- Installation of all refrigeration pipe work, mechanical services pipe work, valves, gas cooler, tanks, evaporators, and other necessary system components.
- Install two HVAC air handling units and ductwork.
- Installation of refrigeration systems to production areas, chillers and blast freezer.