logo

 
 
   03 58 311 112
24/7 Service Please Call

Scope of works: Installation of all new subcritical/transcritical CO2 system, fully integrated into the building cold storage, freezer system, HVAC, and hot water generation.

  • Installation of two Bitzer transcritical CO2 racks.
  • Installation of all refrigeration pipe work, mechanical services pipe work, valves, gas cooler, tanks, evaporators, and other necessary system components.
  • Install two HVAC air handling units and ductwork.
  • Installation of refrigeration systems to production areas, chillers and blast freezer.